THY Operation Center Building C Zone

Updated: Apr 12, 2023

Electrical installation: medium- low voltage panel, automatic transfer unit, busbar, electrical

Cable tray, grounding, fixtures, automation, cabling, energy automation, uninterruptible power

Supply, compensation panel, distribution box, seismic equipment, elavator, fire alarm system,

Building management system, static transfer switch, cctv system, card access system, emergency

Anouncement system


C Zone Operation Center Building


Electrical And Mechanical Works


construction Area: 50.000 M2


Electrical installation: medium- low voltage panel, automatic transfer unit, busbar, electrical cable tray, grounding, fixtures, automation, cabling, energy automation, uninterruptible power supply, compensation panel, distribution box, seismic equipment, elavator, fire alarm system, building management system, static transfer switch, cctv system, card access system, emergency anouncement system


Mechanical installation: sanitation system, heating, ventilation and air conditioning (hvac), fire fighting system, natural gas installation, building control system


Prime Contractor / Employer: THY

Building Area / Name of the Work: Operation Building

Electrical - Mechanical and Fine Works

Commencement / Finish Date: 01/10/2018 / 31/12/2018

Project Status: Completed


 