C Zone Operation Center Building
Electrical And Mechanical Works
construction Area: 50.000 M2
Electrical installation: medium- low voltage panel, automatic transfer unit, busbar, electrical cable tray, grounding, fixtures, automation, cabling, energy automation, uninterruptible power supply, compensation panel, distribution box, seismic equipment, elavator, fire alarm system, building management system, static transfer switch, cctv system, card access system, emergency anouncement system
Mechanical installation: sanitation system, heating, ventilation and air conditioning (hvac), fire fighting system, natural gas installation, building control system
Prime Contractor / Employer: THY
Building Area / Name of the Work: Operation Building
Electrical - Mechanical and Fine Works
Commencement / Finish Date: 01/10/2018 / 31/12/2018
Project Status: Completed